Trainee OS v1.0
Plant: Hub, Balochistan (1,320 MW)
Grid Sync: SYNCHRONIZED (50.0 Hz)
Active load: 1,240 MW
⚙️ Power Generation Schematic Flow (Ground Control) Click Node to Inspect
1. Coal Pulverizer
180 t/h
2. Steam Boiler
540°C
3. Steam Turbine
3000 RPM
4. Generator Grid
1,240 MW
5. FGD Exhaust Stack
22 ppm SOx
📊 Plant Telemetry & Diagnostics
Inspection Node Details
Coal Pulverizer Unit A

Grinds raw coal feedstock into micro-powder to optimize boiler combustion efficiency.

Steam Telemetry Thermal
540 °C
Main Steam Temp
25.4 MPa
Steam Pressure
FGD Emission Monitor HSE Safeguard
SOx Emissions (Limit: 50ppm) 22 ppm
Particulate Matter (Limit: 30mg) 12 mg/Nm³
National Grid Frequency Synchronizer Grid Sync
Manual Turbine Speed Adjust 50.0 Hz
🟢 FREQUENCY SYNCHRONIZED: Connected to grid lines safely.
Ground Operations Console Log
[18:56:02] SYS CPHGC-GridMaster Trainee kernel initialized. Secure sockets linked.
[18:56:06] NET Modbus connection established with Unit A Generator (1,240 MW grid nodes).